PRIMARY PHARMACEUTICALS
| Client: |
|
Johnson
Matthey PLC |
| |
|
|
| |
|
“Johnson Matthey’s Catalysts
and Chemicals Division is a world leader in the supply of
platinum group metal Process Catalysts, Precious Metal chemical
compounds and the refining of precious metal materials sources.”
|
| Project
Name: |
|
Block
2 Laboratory Refurbishment |
| |
|
|
| CRC’s
Responsibilities: |
|
CRC were
appointed by the Client to provide their services as Planning
Supervisor, Principal Contractor and Designer.
CRC were responsible for site set up, strip out, demolition
and removals.
CRC undertook the construction, installation and services
for the laboratory refurbishment through to commissioning
and testing.
|
| Project
Outline: |
|
The refurbished suite was
designed and integrated into the existing facilities.
The envelope was provided by using CRC’s own CMP system
together with proprietary suspended ceilings systems and fully
welded sheet vinyl flooring.
Primary utilities including electrical power and water were
installed together with compressed air, vacuum and nitrogen,
chilled water and gasses, telephone, data and security.
Two fully integrated air conditioning systems were to provide
specified conditions on temperature, humidity and noise for
each of the 8 individual areas which will be served by zoned
heating and cooling to enable individual control of the space
environments.
CRC supplied and installed all benching, cupboards, fume cupboards,
worktops and sinks.
The Project was completed on time and on budget to the Clients
satisfaction.
|
| Contract
Value: |
|
Circ £600,000 |
|
CRC
- Units K1/K2
Temple Court
Knight Road
Strood
Rochester
Kent, UK - ME2 2LT
T: +44(0)1634 295111
F: +44(0)1634 294100 |
|