HOSPITALS
| Client: |
|
The Princess
Alexandra Hospital (NHS Trust) |
| |
|
|
| Project
Name: |
|
CSSD Upgrade
and Refurbishment |
| |
|
|
| CRC’s
Responsibilities: |
|
CRC were
employed as the main contractor to redesign and refurbishment
the hospital’s sterile services department. The contract
to include commissioning and validation of new and existing
HVAC system. CRC acted as the Principal Contactor.
|
| Project
Outline: |
|
CRC initially provided design
services to achieve the employer’s requirements and
meet their performance specification.
The requirement was to re-design and refurbish the whole sterile
services department to include upgrading the packing area
to ISO Class 6. In addition to refurbish and upgrade the staff
facilities and offices.
The upgrade and refurbishment of the entire facility to be
completed on a staged basis to provide continuation of this
crucial internal service to the hospitals operating theatres.
The total square area is 740m2. The clean areas are all at
ISO Class 6 and measure approximately 254m2.
Services included upgrading of incoming utilities, including
steam, water, waste, electrical power supplies, HVAC, data
& voice, fire detection, building management systems.
|
| Contract
Value: |
|
Circ £700,000 |
|