HOSPITALS

  Client:   The Princess Alexandra Hospital (NHS Trust)
     
  Project Name:   CSSD Upgrade and Refurbishment
     

CRC’s Responsibilities:

 

CRC were employed as the main contractor to redesign and refurbishment the hospital’s sterile services department. The contract to include commissioning and validation of new and existing HVAC system. CRC acted as the Principal Contactor.

Project Outline:  

CRC initially provided design services to achieve the employer’s requirements and meet their performance specification.
The requirement was to re-design and refurbish the whole sterile services department to include upgrading the packing area to ISO Class 6. In addition to refurbish and upgrade the staff facilities and offices.
The upgrade and refurbishment of the entire facility to be completed on a staged basis to provide continuation of this crucial internal service to the hospitals operating theatres.
The total square area is 740m2. The clean areas are all at ISO Class 6 and measure approximately 254m2.
Services included upgrading of incoming utilities, including steam, water, waste, electrical power supplies, HVAC, data & voice, fire detection, building management systems.

  Contract Value:   Circ £700,000
 CASE STUDIES
 SELECTOR
communications image
COMMUNICATION
diagnostics image
DIAGNOSTICS
manufacturing image
MANUFACTURE
hospital image
HOSPITALS
medical image
MEDICAL
electronics image
ELECTRONICS
universities image
UNIVERSITIES
primary pharmaceuticals image
PRIMARY PHARM
pharmaceutical image
SECONDARY PHARM

CRC - Units K1/K2
Temple Court
Knight Road
Strood
Rochester
Kent, UK - ME2 2LT

T: +44(0)1634 295111
F: +44(0)1634 294100
 © Clean Room Construction