  Client:   Cambridge Display Technology
     
   

“(CDT) is the leading developer of technologies based on polymer light emitting diodes (PLEDs) being the fast growing new generation of display technologies.”

  Project Name:   Light Emitting Polymer Pilot Plant
     

CRC’s Responsibilities:

 

CRC were employed as the main contractor on a full turnkey design and build basis. Commissioning, validation and hook-up attendance upon the client’s equipment suppliers was included. CRC acted as the Principal Contactor and Planning Supervisor.
CRC were responsible for planning, building control and statutory authority approvals.

Project Outline:   CRC initially provided design services to produce the Employer’s Requirement Document which was in a performance specification format suitable for design and build contractors to bid against. CRC then bid in competition for and were awarded the design and build contract.
The project was for the development and fitting out of three speculatively built warehouse/office buildings to house clean room, laboratory and office facilities.
Additional accommodation space was created by the installation of new mezzanine floors.
External accommodation was created for liquid nitrogen and chemical storage, chillers, transformers and standby generators.
The total square area was 2000m2. The clean rooms included Class 10, 100 and 1,000 areas.
Services included upgrading of incoming utilities, liquid nitrogen, specialist gases, 18 MegOhm de-ionised water, automatic chemical waste handling, fume extraction, HVAC, process cooling water, compressed air, automatic, standby generators, UPS, data & voice, fire detection and suppression systems, building management systems.

  Contract Value:   Circ £3.8m
 CASE STUDIES
 SELECTOR
communication image
COMMUNICATION
diagnostics image
DIAGNOSTICS
manufacturing image
MANUFACTURE
hospital image
HOSPITALS
medical image
MEDICAL
electronics image
ELECTRONICS
universities image
UNIVERSITIES
primary pharmaceuticals image
PRIMARY PHARM
pharmaceutical image
SECONDARY PHARM

CRC - Units K1/K2
Temple Court
Knight Road
Strood
Rochester
Kent, UK - ME2 2LT

T: +44(0)1634 295111
F: +44(0)1634 294100
 © Clean Room Construction