Commissioning is the planned process of safely bringing
plant and systems into an operational state ready for validating.
We do this on every project we build.
It will apply to all electrical and mechanical systems
and there will be a logical stepwise progression for safely bringing
systems onto line, usually starting with lighting, electrical power
and controls and progressing through HVAC, piped services and other
utility systems.
CRC will use its
own project and electrical engineers to plan, manage and execute
the commissioning of their systems, sometimes with specialised support
from equipment manufacturers where appropriate. Prepared commissioning
checklists enable rapid identification and rectification of any
problems and ensure the systems are ready for testing in accordance
with the programme.
Qualification
Qualification is the process of testing, regulating
and adjusting the systems to demonstrate that they produce the specified
operational performance and to verify that they meet the designintention.
CRC will define
the required tests in terms of the applicable standards, the appropriate
test method and measuring instruments. Some or all of the following
may be involved:
Piping services - integrity, flow rates quality, temperature
and pressures.
- Electrical services
- to latest IEE regulations
- Air volume flow rates
- Fan performance
- Cooling/heating/humidification plant
performance
- HEPA Filter media and seal integrity
- Control and plant safety interlocks operation
- Temperature/humidity/pressure control
- Sound levels
- Light levels
- Vibration levels
- Ductwork air leakage
- Room air pressures
- Room airborne particle counts
- Room air velocity/vector profiles
- Room air cleanliness recovery periods
- Smoke visualisation of room air patterns
and videorecording
- Exhaust and fumigation systems operation
- Wet stations, fume cupboards and safety
cabinets operation
To obtain measured values in these tests CRC
uses the appropriate calibrated test instruments, traceable to national
standards, normally through BSIRA or other accredited test houses.
Results of all tests are accurately recorded and presented
in the Handover Technical manuals supplied at the end of every project.
|