To view this image album of our work, you require Flash
Project Outline: CRC was selected on a two stage design and build open book basis. The facility was completed to meet the demanding MHRA licensing requirements with EC GMP Grade B aseptic handling areas and Grade C preparation areas.
Location: Oxford
Duration: 8 months
Consultants: N/A

